SHELL CONSTRUCTION · CALCULATION

Interlocking paving and path.

Enter the area and perimeter. We will calculate paving, crushed stone base, bedding grit, kerbs, geotextile, jointing sand and excavation – with a build-up section.
✓ Bill of quantities✓ Element diagram✓ We quote the price✓ PDF · CSV · link
1Area and perimeter
2Use
This material is not in the e-shop yet – we will price the list for you. You can edit quantities and item notes in the list, then send it as an inquiry, download it as PDF or share it via a link.
Diagram and summary
Paving—
Gravel—
Kerbs—
Items on request—
Your materials
Total incl. VATapproximate, excl. delivery—
How we calculate
  • Paving = area + 5 % for cutting; grit bedding 4 cm; crushed stone base 15 cm (footpath) or 30 cm (cars) – volume × 1,2 for compaction; in tonnes approx. 1,6 t/m³ (loose).
  • Paving 6 cm thick (footpath) or 8 cm (cars); kerbs = perimeter + 3 % (1 m pieces; road kerbs at driveways), concrete for kerb bedding 0,04 m³/lm; geotextile = area + 10 %.
  • Excavation = area × (paving + bedding + base). Joint sand approx. 5 kg/m² (depending on paver format and joint width, joint 3–5 mm). On unstable subgrade that compacts poorly the manufacturer adds 5–10 cm to the base layer; on clay also drainage.
Total incl. VAT—